Polite PowerTech successfully executed the 132kV line shifting and underground cabling project for GETCO with complete turnkey responsibility. The scope of this high-voltage infrastructure project included the systematic dismantling of existing overhead transmission lines, rerouting of power corridors, and the supply, laying, jointing, termination, and testing of 132kV underground cables.

This critical project was undertaken to support infrastructure development and urban expansion initiatives while ensuring uninterrupted power supply and operational continuity. Our team meticulously planned and executed each phase to minimize disruption, particularly in sensitive and high-density areas.

Leveraging advanced equipment, skilled engineering, and strict adherence to safety protocols, the project was completed on time and in compliance with GETCO’s stringent quality standards. This successful execution reinforces Polite PowerTech’s expertise in handling complex, high-voltage transmission and underground cabling works with precision, reliability, and engineering excellence.

Projects

Explore Our Project