Polite Powertech Pvt. Ltd. successfully executed the 11 kV CH-1 & CH-2 electrical works at VEDANTA Ltd., Korba, Chhattisgarh, a critical component in strengthening the medium-voltage distribution infrastructure within the plant premises. The project was undertaken to ensure seamless and reliable power distribution for Vedanta’s high-demand industrial operations.
The comprehensive scope of work included:
- Retrofitting and installation of 11 kV switchgear panels and associated electrical infrastructure
- Laying and termination of 11 kV HT power cables, with proper route marking, jointing, and interconnections
- Testing and commissioning of the complete 11 kV system, including protection relay configuration, insulation resistance checks, and load trials
- Integration with existing systems while ensuring minimal disruption to ongoing plant operations
- Strict adherence to Vedanta’s safety protocols and quality standards throughout the project lifecycle
This project was delivered within the agreed timeline, reflecting Polite Powertech’s commitment to quality execution, technical excellence, and client satisfaction. The upgraded 11 kV CH-1 & CH-2 system now plays a vital role in enhancing operational efficiency and power reliability for Vedanta’s Korba facility.